Mountain View

Past Project

STC-1033

2016

6″ Flexible pipe, 6″ & 8″ rigid pipe including riser installation from 36.6 to 44 meter water depth

LFG FSO Gas Concord Restoration

2016

Remove transport company properties from the LPG FSO Gas Concord to delivery point and restore the LPG FSO Gas Concord

Jangkrik Complex Project

2015

Installation of 4″ & 24″ pipelines (Piggy Back) from Sapi Field landfall to 13 water depth

EPCI 16" ORF Pulau Pemping to Power Plant Gate Tj. Uncang

2013

Subsea pipeline 16 in – 13.5 km

STC-0949

2015

Subsea pipeline 10 in – 32.1 km, 3 x 12 in – 3.6 km sectional replacement, 2 x 14 in – 1.4 km sectional replacement & riser installation

Banyu Urip EPC 3 Project

2013

Subsea pipeline 20 in – 23 km from Palang landfall to mooring tower at Tuban Offshore

Accelerated Pipeline Repair and Replacement

2013

Subsea pipeline 12 in – 9 km, 10 in – 1 km, 2 pipeline crossing support & Riser installation

Screw Piling for 12" and 16" Pipeline

2013

Subsea pipeline free span correction using Screw Piling method for 12″ & 16″ pipeline crossings

Pipeline & ORF Floating LNG

2012

Subsea pipeline repair 24 in – 500 m & Riser installation

6" Gas Lift Repair Pipeline

2011

Repair of the leaking subsea 6″ Gas Lift Pipeline and piping modification at WHP-B and WHP-A

SPM PLEM Subsea Pipeline Installation

2009

Installation of 32″ 6 km and 18″  9 km offshore pipeline and SPM 35 kDWT & 150 kDWT

16" Sectional Relocation and Installation

2014

Above Water Tie-in (AWTI), Post Trenching and Dredging work at Karang Jamuang Island

LNG Floating Storage & Regasification Facilities

2013

Subsea pipeline 24 in – 21 km including Riser installation

MRA-MMJ Pipeline Project

2013

Subsea pipeline 6 in – 9 km including crossing support & riser installation

6" Gas Lift Pipeline EPCI

2012

Topside platform modification (Brownfield), subsea pipeline 6 in – 9 km. & Riser installation

18 inch Export Pipeline Repair

2011

Repair of the leaking subsea 18inch Export Pipeline from WHP-A to OPF Gresik

KG Development Project Services

2011

Brownfield Modification, Umbilical and 6″ pipeline installation from KRA to KG Platform and from Subsea well to KG Platform

Oyong Phase 2

2008

Installation of 14″ offshore pipeline from existing Oyong – A WHP at offshore Sampang (South Madura) to the OPF at Grati, Pasuruan (East Java) for 60 km  at 0 to 56 meter water depth